The MWN Civil high performance team strives for a high standard of quality with outstanding outcomes - no project is considered "business as usual". 

 
 

67_expanded_gallery3.jpg

THE BAY                                     Kohimarama, AKL 


Client: Kensington Properties

14 unique lifestyle residences providing apartment-style living, with the ample dimensions and privacy of a stand-alone home. From the generous underground parking allowance - three spaces per abode - to the large storage areas and decks, every inch of these 3000 sq ft-plus apartments spells space.


The scope included: 

  • Basement drainage/placing of draincoil/scoria and back filling
  • digging of footings and pads for block walls
  • filling and compacting around apartment areas to designed landscaping levels
  • shaping of areas in preparation for lawns and gardens
  • drilling for retaining walls, decks and fence posts
  • all service trenching including power, telephone, data, gas and water
  • excavation and metal preping to concrete level for driveway ramps to basement parking
  • excavation and metal preping for main entrance carriage-way
  • reinstatement of topsoil berms and hot mix foot paths.

The 2.5 tonne digger and 4 tonne truck were utilised extensively on this site to handle all work requested by the client and were particularly versatile due to their compact sizes.

MWN Civil Ltd were retained onsite full time to the completion of the project utilising versatile equipment and operator's skills and experience.

Our dedication to the client's requirements aided in the successful completion of this project on schedule. 

67_expanded_gallery2.jpg

BEACH ROAD UPGRADE                Britomart, AKL


Client: Dominion Constructors

Dominion Constructors were the principal contractor to whom MWN Civil Ltd were subcontracted to undertake the lighting upgrade portion of the contract.

 


The scope included: 

  • Excavation for lighting foundation pads
  • Drilling for lighting foundation pads
  • Trenching for power supply cabling
  • Spoil and aggregate cartage.

 

QUEENS STREET UPGRADE                  CBD, AKL


Client: Dominion Constructors

Dominion Constructors were the principal contractor to whom MWN Civil Ltd were subcontracted to undertake works for the tree pit, footpath and excavation for the water feature.

 


The scope included: 

  • Service locating
  • Demolition and excavation
  • Back filling of aggregates to design subgrade
  • Spoil and aggregate cartage.
  • Auger drilling for piling